Can SpaceX Winning AI Data Centers Overcome Losing Model and Tesla Beyond the Roadster
SpaceX can build a minihard AI data center in about 5 months. There’s room for six in Texas and six more in Tennessee, so a dozen could be under construction at once. Each one costs about $13B to build and could bring in roughly $27B a year in revenue, at about 40% lower cost than ...
Link :
https://www.nextbigfuture.com/2026/10/huge-q3-earnings-critical-spacex-projects-in-texas-and-tennessee.html
Link :
https://www.nextbigfuture.com/2026/10/huge-q3-earnings-critical-spacex-projects-in-texas-and-tennessee.html