The purpose of the looking at the future...is to disturb the present!

Gaston Berger (1896-1960), francuski futurolog

Can SpaceX Winning AI Data Centers Overcome Losing Model and Tesla Beyond the Roadster

SpaceX can build a minihard AI data center in about 5 months. There’s room for six in Texas and six more in Tennessee, so a dozen could be under construction at once. Each one costs about $13B to build and could bring in roughly $27B a year in revenue, at about 40% lower cost than ...

Read more


Link :
https://www.nextbigfuture.com/2026/10/huge-q3-earnings-critical-spacex-projects-in-texas-and-tennessee.html